Calabrian railway network

Work planned on the Calabra Network has the following main aims:
• linking the port of Gioia Tauro with the Adriatic corridor, and through this, with the southern railway network and that of Central Europe
• improving links to access HS/HC infrastructure (Salerno-Naples-Rome) via the upgrade of the Battipaglia-Reggio Calabria line
• increasing the capacity offered in qualitative and quantitative terms within the Reggio Calabria metropolitan area
• significant improvement to customer accessibility to rail travel and technological work to improve safety. 

The following work has been planned to achieve the above aims:
• technological and infrastructural adjustment work to increase performance and reliability on the Battipaglia-Reggio Calabria line*
Lamezia Terme-Catanzaro Lido infrastructural and technological upgrade
Reggio Calabria-Melito track doubling P.S.
Gioia Tauro-Taranto alternative freight route, speeding up the Sibari-Cosenza stretch*

*multiregional effort 

WORK COMPLETED

Lamezia Terme-Catanzaro Lido infrastructural and technological upgrade  199  MIO €
variation in the lay-out of the Settignano - Catanzaro Lido line, new Catanzaro station and tecnological upgrade 2008
completion work, both infrastructural and technological, including the Overall Development Plan for Catanzaro Lido Station  2009  

 Reggio Calabria-Melito track doubling  167 MIO €
electrification of Reggio Calabria-Reggio Calabria Pellaro stretch 2005 
 track doubling of Reggio Calabria Pellaro-Melito Porto Salvo with CTC 2006
electrification of Reggio Calabria Pellaro-Melito Porto Salvo 2007 

Gioia Tauro-Taranto alternative freight route with speeding up of Sibari-Cosenza   43 MIO €
stretch  route upgrade 1st phase 2005  
Sibari PBRRI    2007  
Metaponto PBRRI  2009


WORK IN PROGRESS  

Technological and infrastructural adjustment work to increase performance and reliability of the Battipaglia-Reggio Calabria line  230 MIO €
The preliminary design is at the review stage for CIPE approval  2014

Reggio Calabria-Melito track doubling   167 MIO €
Small completion projects are underway  2011 

Overall cost of the work is equal to 639 MIO €.