Bologna-Verona-Brennero

The Bologna-Verona-Brennero route is part a component of the Berlin-Palermo Corridor and is part of European Union planning for Trans European corridors.
On this route, relevant infrastructure and technological investments are planned, aimed at giving the route itself the necessary performance features to grant it the capacity, in terms of supplying freight and passenger traffic, to fulfil the role of primary connecting axis between the Italian network and that of Central Europe.
The two main projects are:
1. technological upgrade of Bologna-Verona-Brennero consists, essentially, of:
• installing the Command and Control System (CCS) on the entire line, commanded from the Verona Central Control Point
• completing the train separation system using the Automatic Block System (ABS) along the line and in stations, installing the equipment remote-control functions
• adapting certain stations, bringing them in line with the Overall Railway Development Plan and installing new station equipment
• adjusting the electric traction equipment
• the automation/elimination of Level Crossings
2. Bologna-Verona track doubling, as part of completing the track doubling along the entire line for an overall 114 km. 

WORK COMPLETED
 
Bologna-Verona-Brennero technological upgrade  274 MIO€
activation of the 1st Verona-Brennero functional stretch CCS 2004
activation of the 2nd Bolzano-Brennero functional stretch 2007
activation of the 3rd Trento-Bolzano functional stretch 2007
activation of the 4th Verona Hub functional stretch 2008
activation of the 5th Verona - P. Rusco functional stretch 2009
Ala, Rovereto and Mattarello Central Computerized System 2004
P.Tires and Bressanone Central Computerized System 2005
Bronzolo and Egna Central Computerized System 2007
Roncafort Central Computerized System 2008
activation PBRRI Bolzano Station 2008
activation CCBS Verona - Brennero 2007

Bologna-Verona track doubling 892 MIO€
Tavernelle-S. Giovanni in Persiceto track doubling 2005
S. Giovanni in Persicelo-Crevalcore track doubling 2006 
Crevalcore-S.Felice sul Panaro track doubling 2007
S.Felice sul Panaro-Poggio Rusco track doubling 2008
line on new Poggio Rusco-Nogara bed 2008 
completion of Poggio Rusco-Nogara track doubling and completion work across the whole line  2009


WORK IN PROGRESS
 
Bologna-Verona-Brennero Upgrade  274 MIO€
Trento Station Central Computerized System  2010


Work on the route is undertaken as part of a multi-region effort (Trentino Alto Adige-Veneto-Lombardy-Emilia Romagna) with an overall value equal to €1166m.

Further Reading

Attachments

Help  |  Site Map  |  Accessibility Logo attestante il superamento, ai sensi della Legge n. 4/2004, della verifica tecnica di accessibilità.  |  Credits
© Gruppo Ferrovie 2008  |  Contacts  |  Legal Notes  |  VAT Number 05403151003  |  PDM  |  SIGMAP  |  Link