Tanzania

WORK IN PROGRESS

Provision of technological consultancy services for the Morogoro-Makutupora railway
The 21 February 2018 Italferr has signed a new contract for the design of the signalling on the 344 km Morogoro-Makutupora (Lot II).
The project is part of a Design & Build project awarded by RAHCO (Tanzanian Railways) to the group coordinated by the Turkish constructor Yapi Merkezi.

The expected duration for the provision of these services is 6 months, beginning from March 2018.

Tanzania Central Corridor (TZCC) Package 1: Dar Es Salaam-Morogoro SGR Project (205 km) - Preliminary Design of Signaling System
Yapi Merkezi following the awarding by RAHCO (Reli Assets Holding Company Ltd.) of the D&B for "Tanzania Central Corridor (TZCC) - Package 1: Dar Es Salaam - Morogoro" has appointed Italferr for the development of signaling & telecommunication systems.
The scope of Italferr services includes:
  • development of technical documentation, requirements and performance specification related to the signaling, and review of telecommunication and power supply project;
  • out line design of the signaling system based on ETCS Level 2 and Computer Based Interlocking.

Moreover, the design will be developed according to International Standards (CENELEC  50126, 50128, 50129, 50159-1 50159-2).

The contract started last June 2017, and will end next June 2018.